byZenithynZenith YN

Run a shift: open, crew the pumps, read the meters, close

Open a shift, put the crew on the pumps nozzle by nozzle, and close it with each nozzle's totalizer reading so the sales post.

Video 2 min For Manager Tutorial 10 of 20